Case Study.

Client
Commercial

Project
Custom Frame, High Bending Moments, Restricted Access

Overview
When the client was assigned to do a LED Screen inside an existing Shed, Surefoot was the first option and the most viable, because no heavy machinery was required to install the foundations for the support mast.

Because of the high bending moment in the base of the structure, a frame using four S600 were selected after reviewing the soil test and the design by the structural engineer.

Brief
Only a minor cut in the existing slab and a revision on the location of existing services was needed to perform the installation.

Once the Surefoot and the base frame were installed, the mast and the Screen were erected in no time

Conclusion
The final structure can be seen from a long distance.

Have a Question?

Get in Touch.

Contact us today and one of our specialist personnel will be very pleased to provide you with the best performance and solutions tailored to your specific project and service needs.

Give us a call on 1300 809 565 or get in touch online.